The project is delivered. What still needs closing?

The team has delivered the last item, but the project manager is still waiting for the client's acceptance. Meanwhile, a billing colleague is asking about work missing from the invoice. Automating professional services project closure can bring these loose ends together and direct each one to the person who can resolve it. The manager can see what still needs attention before archiving the project.

Author

Syntalith

Published Updated 5 min read

The next engagement is already on the calendar. Questions about the previous one keep arriving, though: did the client accept the deliverable, who reviewed the last time entry, and was it included in the draft invoice? People look in different places for answers. The manager opens an email thread while the billing colleague compares work records with the draft. A shared view of outstanding items is useful if it helps them finish those tasks without reconstructing the project's history each time.

Two open items after the final delivery

Suppose a services firm has sent its final report to the client. The project's agreed acceptance process calls for client confirmation, which the manager has not yet received. A billing colleague has also prepared a draft invoice. After that draft was created, an additional work entry arrived, already approved by the firm for billing. It is missing from the draft.

The manager needs to see which report was sent and that client confirmation is still outstanding. They can then return to the relevant correspondence and decide how to follow up. Marking the task complete records the team's work. It does not establish whether the client accepted the result under this project's arrangements.

The billing colleague compares the approved work entry with the draft invoice lines and investigates the omission. Separately, they check the project's agreed invoicing conditions, including any connection to client acceptance. They can then identify what needs adding to the draft and which confirmations are still outstanding.

A useful project summary would show the manager both issues and who is handling each one. Once the client confirms acceptance, there is no need to keep asking about it. The omitted billing entry stays visible until the billing colleague resolves it. The manager no longer has to ask everyone what is behind a broad label such as “project in progress.”

A draft invoice can precede the last work entry

If you use Dynamics 365 Project Operations, ask your administrator about refreshing transactions on a draft proforma invoice. Microsoft describes adding late-arriving records of work and other project transactions, called actuals, when they are past-dated, marked ready to invoice, and not yet included in the draft. Microsoft also documents Billing hub, which brings together contracts, contract lines, and related actuals before proforma invoice creation. Some enhancements require a feature to be enabled. Check what your deployment supports before commissioning additional automation.

That billing view can help identify omitted work. The report's acceptance in our example still needs a separate check. A draft invoice does not establish client acceptance or payment. The manager needs access to the acceptance information even when the project's billing records are all in one application.

When a shared list is enough

For a firm managing a small number of projects, a closeout list in the existing project tool may be sufficient. Each item links to the relevant record or agreement and names the person who will follow up. Someone needs to update it when the issue is resolved. Another list alongside email threads and billing spreadsheets will otherwise add work for the manager.

Automation becomes worth considering when people regularly search several systems for outstanding items. It can bring together a delivery record and its acceptance confirmation, or compare approved work with the prepared billing document. When a link is missing, it should show the employee what could not be established. Similar task names are not enough to conclude that two records refer to the same work.

If the main difficulty is checking invoices from subcontractors, our article on reconciling subcontractor work with invoices covers that narrower task. Closing an entire project calls for a broader view of what remains open with the client and the billing team, and who is following up.

AI may help locate a passage about acceptance in a long email thread. The employee should be able to open the message and check what it refers to. Decisions about accepting a deliverable or approving billing remain with the people designated by the firm. Collecting outstanding items from structured records may not require a language model at all.

Start with a project your team recently closed

In a proposed Syntalith project, we connect information from the existing tools and build a view of the items that remain open. The initial scope can cover one type of engagement. The project manager and billing colleague then revisit a job they know: can they find the missing acceptance and the work omitted from the draft invoice, and see what remains after those issues are resolved? This gives them a way to assess the view before extending it to more projects.

You can start a conversation about automating project closeout by describing the last engagement your team had to revisit after delivery. Explain what you were looking for and which applications you used. That description is enough for an initial discussion; you do not need confidential contracts or a complete specification. See Syntalith's pricing page for pricing information.

Reduce manual work in a defined process

Start with where work gets stuck and who has to repair it. We will compare the available improvements with implementation and operating costs.

Explore AI automation
Discuss an automation