Project approvals: what did the client approve?
Short answer
A project approval system records the client's decision separately for each item handed over and its version, so approval of a drawing does not close a request to fix the manual. First check approvals in your current tool, and build your own view when the client needs a simple place to reply.
How we workDetails ↓
- 01Call30 minutes with an engineer, free
- 02PrototypeA working system on your process and data, free
- 03ImplementationTarget and fixed price in the contract; 50% at signing
- 04Acceptance50% once the agreed target is met
- net per application, fixed price before contract
- from €3,000
- from signing the contract to acceptance
- 4–10 weeks
- free prototype on your documents
- €0
We belong to the OpenAI and Anthropic partner programmes and learn through their official courses. What this means ↓
Author: Syntalith · 4 min read
Statistics
Projects and AI: statistics 2026
2.5 mo.
payback of €3,000 at 200 items for approval a month: €1,745 of work today, €526 with checking and the model. Scenario.
48%
According to the European Commission (2026), 48% of EU SMEs and mid-caps name a lack of expertise as a barrier to AI.
Source: European Commission, Flash Eurobarometer 578 (2026) ↗
20.0%
According to Eurostat (2025), 20.0% of EU companies with at least 10 employees used AI.
50%
According to the European Commission (2026), half of EU SMEs and mid-caps name high investment costs as a barrier to AI.
Source: European Commission, Flash Eurobarometer 578 (2026) ↗
59%
According to Microsoft and LinkedIn (2024), 59% of leaders worry about quantifying the productivity gains of AI.
Source: Microsoft and LinkedIn, Work Trend Index 2024 (2024) ↗
Figures checked: 22 October 2026
- 01Hand-overitems with their versions
- 02Decisionseparate for each item
- 03Fixgoes back to the author with the client's comment
- 04New versiona new decision from the client
- 05Teamsees what is left to do
The drawing stays, the manual goes back to its author
Say a team hands the client a design drawing and an operating manual. A technical person on the client's side checks both files. They approve the drawing, and point out a passage in the manual that needs fixing. The project manager writes a general “approved” status on the board. A colleague taking over the project sees a finished review and does not know that the manual's author still has a task.
In the proposed app, the client opens both items in one place and replies to each separately. On the drawing, the team sees the approval and the file the client looked at. On the manual, the comment stays, with the person handling the fix. The project manager can pass the specific comment straight to the author, and show on the board that some items are still waiting for approval.
The author adds the corrected manual to the same matter. The client goes back to the earlier comment and assesses the new version. The decision on the drawing stays with the approved file; replacing the manual does not overwrite it. When someone later asks how the hand-over went, the project manager opens the right item together with the client's reply.
The client needs a simple place to give project approvals
The person checking the items may use your system only when a project is handed over. They should easily find the file to assess, the earlier comment and a place to reply. If a different person checks the manual from the one who checks the drawing, each needs access to their own items and a clear note of what the team expects from them.
For the project manager, a view of the whole hand-over helps: which file the team is fixing, and which is waiting for the client's reply. From there they can go to the author's task and the text of the comment. Such a view makes most sense when today you have to piece the project board together with emails and the file folder.
What you can do in your current tool
Power Automate supports approval requests with different response modes for approvers. Involving guest users requires conditions on the environment, settings and licences to be met. That is a starting point for a conversation with the administrator about your current approval flow.
In the project tool you use, check whether you can keep separate decisions for the drawing and the manual, and keep the file the client assessed. Having an approval feature does not settle how the current configuration handles replacing an attachment. If the information you need is already available, changing how the hand-over is run and setting up a view for the project manager may be enough.
An integration is a sensible purchase when the client has a convenient place to reply, and the team retypes decisions into tasks by hand. The reply on an item can be linked to its version and to the work of the person fixing the document. Your own app is worth considering when the available tools still force the client and the team to rebuild this history in several places. The scope can cover only handing over items, keeping the current board for day-to-day project work.
Open matters and later support
When you change tools, some items will already be approved and some will come back with comments. Moving such matters should keep the assessed files and the decisions with their right versions. The project manager needs to see what is still open. Older hand-overs can stay in an accessible archive.
When comparing offers, include support for clients who lost access or passed the review to a colleague, and upkeep of the connection to the project board. Settle who deals with a reply recorded in the portal that did not reach the task.
For your own app, agree ownership of the code and data, and access to the documentation a later supplier would need. The export should keep decisions together with the files they concerned, so the review can be rebuilt outside the portal.
How Syntalith can organise the approval of project items
As part of custom software and integrations, Syntalith can prepare a place for the client to review items and link their replies to the team's tasks. The project manager then gets a view of the remaining work, and a document's author can go back to the comment on a specific version. Your team sets which items it hands over, and agrees with the client who assesses them and when the review is finished.
Tell us about the last project where an “approved” status needed further explanation. On that example we will settle whether you need a change to the current flow, a connection between tools or your own view for the client. Syntalith's apps start from €3,000 net, and we set the scope after a free process review (pricing).
What a project approval system costs and when it pays back
- Today
- 200 items for approval × 15 min = 50 h × €34.90 = €1,745
- With the system, a person checks the output in 30% of the time
- €524
- Model, 1 call per case, Claude Sonnet 5.5
- €2
- Cost of one case
- €8.73 today, €2.63 with the system
- Saving
- €1,219 a month
Payback of €3,000
2.5 months
The volume, the time and the checking share are the scenario's assumptions. €34.90 an hour is the EU average hourly labour cost for 2025 according to Eurostat. Model: 3,000 input tokens and 300 output tokens per call at Anthropic's rates, converted at the ECB rate of 1.1205 USD per euro.
- Time from receiving a case to the result, before and after the change
- Cases the app passed to a person
- Corrections by the person checking
- Model and maintenance cost at the target volume
Where to start
In the free process review we choose one process and count the team's volume and working time, and within 2 working days you get a written summary with a price. We build as part of AI apps, and we price maintenance separately.
Worked example · Scenario
How we count the payback: project approvals
We run the same count for your office in the free process review.
€4,363
a month for handling 1,500 job emails
Payback: 0.8 mo.
5 minutes to read an email and reply and checking in 15% of the old time are our assumptions. €34.90 an hour is the EU average hourly labour cost for 2025 according to Eurostat, for companies with 10 or more employees. Model cost: Claude Sonnet 5.5, about 3,000 + 600 tokens per message with a draft reply, at the ECB rate of 1.1205 USD per euro on 22 October 2026.
See the full calculation →